BushProof is involved in hydrogeological prospecting at the Bekisopa mine site in the Haute-Matsiatra region. Two 150 m wells and 70 m piezometers were installed by our team. Pumping operations were carried out to gather information on the behavior of the aquifer. The datas have been delivered to the hydrogeologist. This survey will be used to dimension production and the construction of production wells for the site.
Client : AKORA Resources Ltd.