Mathieu Monteleone

Le document BushProof : Care homes strategy for Infection Prevention & Control of Covid-19 based on clear delineation of risk zones cité par l’OMS et la British Geriatric Society

Depuis sa mise en ligne le 18 avril, le document de BushProof Care homes strategy for Infection Prevention & Control of Covid-19 based on clear delineation of risk zones (Stratégie des Centres de Soins pour la prévention et le contrôle des infections dues au Covid-19, basée sur une délimitation claire des zones à risque) a […]

Le document BushProof : Care homes strategy for Infection Prevention & Control of Covid-19 based on clear delineation of risk zones cité par l’OMS et la British Geriatric Society Read More »

BushProof Care Homes Strategy for Infection Prevention & Control of COVID-19 in care homes cited by WHO & British Geriatric Society

Since going online on 18th April, the BushProof document Care homes strategy for Infection Prevention & Control of Covid-19 based on clear delineation of risk zones has been widely cited and discussed, and has influenced how infection prevention is being advocated and carried out in the UK. So far it made it into the following

BushProof Care Homes Strategy for Infection Prevention & Control of COVID-19 in care homes cited by WHO & British Geriatric Society Read More »

Care Homes Strategy for Infection Prevention & Control of Covid-19 Based on Clear Delineation of Risk Zones

This is a holding page for the document Care homes strategy for Infection Prevention & Control of Covid-19 based on clear delineation of risk zones. This strategy builds upon current UK government guidance, but in addition it Expands the concept of infection prevention by clear delineation of risk zones for the entire building (rather than

Care Homes Strategy for Infection Prevention & Control of Covid-19 Based on Clear Delineation of Risk Zones Read More »

Drainage gallery Akamasoa

Drainage gallery

BushProof has just started the construction of a groundwater drainage gallery in a shallow valley filled with low permeability sediments. The installation of the 20 metre long drain will help to convey groundwater in a more efficient way to a 10 metre deep abstraction well built on the side. The system will supply water to

Drainage gallery Read More »